Introduction
Central production and operational information.
Welcome
Welcome and thank you for being part of the preparation for the Limp Bizkit event in Madrid, featuring special guests P.O.D. and Death by Romy.
On this website you will find detailed and updated production information to check schedules, access, technical specs, suppliers, hospitality, logistics, and plans in one place.
We have also gathered here the main requests and comments that have been worked on during the previous weeks of preparation, so that the entire team has a common and clear reference.
📍 How customers get to Movistar Arena — Madrid
The venue is located at Av. de Felipe II, s/n, 28009 Madrid, Spain.
- By Metro: Goya Station (Lines 2 and 4) or O'Donnell Station (Line 6).
- By Bus: Lines 15, 21, 26, 43, 53, 61, 63, C1, C2.
- By car: Located in the city center. Public transport is highly recommended due to high traffic.
- Parking: Public parking available nearby (e.g., Felipe II parking).
📎 Route detail.pdf
Risers
Stage Risers & Rolling Decks
Requirements for band risers, drum risers, and additional stage platforms.
Riser Specifications
- Drum Riser: Rolling riser with specific dimensions and carpet requirements.
- DJ/Keys Risers: Additional platforms needed for the band members.
- Construction: Must be sturdy, leveled, and fitted with locking casters and skirting.
_Refer to Limp Bizkit 2026 Risers DRN1 AAUK.pdf for exact dimensions, placement on stage, and height requirements for each riser._
Audio
Audio Requirements & Communications
Detailed audio specifications and email correspondence regarding the PA system and control.
Overview
This section includes the latest communications with the audio vendor and touring team. It covers:
- System design and PA deployment requirements.
- Front of House (FOH) and Monitor console specifications.
- RF coordination and frequency management.
Equipment Provisioning
| Item / Requirement | Limp Bizkit | Locally Provided |
|---|---|---|
| PA System & Subs | ✔️ | |
| Wedges | ✔️ (12x) | |
| Side Fills | ✔️ | |
| HMA Fibre Snake (32 single to FOH) | ✔️ | |
| Power: 63A 3-Phase (Monitor World) | ✔️ | |
| Control (Consoles) | ✔️ | |
| Microphones | ✔️ | |
| RF Equipment | ✔️ |
Labour
Local Crew & Labour Call
Complete breakdown of local staffing and stagehands required for the load-in, show, and load-out phases.
Staffing Overview
- Load-in: Riggers, stagehands, forklift drivers, and electricians required for the setup phase.
- Show Call: Followspot operators, stage hands, and standby crew.
- Load-out: Full dismantling crew to ensure a swift teardown.
Crew Calls - 01/07/2026
| Quantity | Role | Department (Task) | Start | End |
|---|---|---|---|---|
| 2 | HAND B | SITE | 07:00 | 15:00 |
| 8 | HAND B | BACKLINE | 08:00 | 15:00 |
| 4 | HAND B | RISERS / DECKS | 08:00 | 15:00 |
| 10 | HAND B | PRODUCTION | 08:00 | 15:00 |
| 1 | FORKLIFTER | RISERS / DECKS | 08:00 | 15:00 |
| 1 | CREW HEAD | CREW CHIEF | 08:00 | 15:00 |
| 10 | HAND B | PRODUCTION | 22:30 | 03:30 |
| 4 | HAND B | RISERS / DECKS | 22:30 | 03:30 |
| 8 | HAND B | BACKLINE | 22:30 | 03:30 |
| 2 | HAND B | SITE | 22:30 | 03:30 |
| 1 | FORKLIFTER | RISERS / DECKS | 22:30 | 03:30 |
| 1 | CREW HEAD | CREW CHIEF | 22:30 | 03:30 |
Lighting
Lighting Design & Fixtures
Technical specifications for the lighting rig and floor package.
Lighting Specifications
- Main Rig: Overhead lighting plot details and fixture types required by the touring LD.
- Floor Package: Specific positioning for ground-supported fixtures.
- Control: Console requirements and networking protocols.
Equipment Provisioning
| Item / Requirement | Limp Bizkit | Locally Provided |
|---|---|---|
| Main Rig (3 straight onstage trusses) | ✔️ | |
| Front Truss (Spots + 8x Washes) | ✔️ | |
| Lighting Fixtures (as per plot) | ✔️ | |
| Control (MA3 full size in MA2 mode) | ✔️ |
Power
Power Distribution & Safety Regulations
Comprehensive electrical requirements, power drops, and local safety regulations for the Movistar Arena.
Electrical Needs
- Stage Power: Clean power requirements for audio, lighting, and video departments.
- Motor Power: Specific drops for rigging hoists.
- Shore Power: External power for tour buses and production trucks.
Certifications & Safety
Local regulations in Madrid require strict adherence to safety standards. The attached documents cover:
- Datos eléctricos WZC.pdf: Detailed electrical data and consumption estimates.
Rigging
Rigging Plot & Weight Loads
Structural limitations and hanging points for the Movistar Arena roof.
Rigging Details
- Points & Motors: Total number of hanging points, motor capacities, and exact positioning.
- Weight Limits: Maximum load capacities per beam and overall roof limits.
- Clearance: Trim heights required for the lighting trusses and PA hangs.
_Please review LIMP BIZKIT MADRID-LIGHTING V2.pdf for the updated rigging plot and weight distribution calculations tailored to the venue's grid._
Point Loads Table
| Point | Load (kg) | Point | Load (kg) | Point | Load (kg) |
|---|---|---|---|---|---|
| 101 | 125.00 | 116 | 165.00 | 211 | 440.00 |
| 102 | 350.00 | 117 | 180.00 | 212 | 440.00 |
| 103 | 350.00 | 118 | 200.00 | 213 | 420.00 |
| 104 | 125.00 | 119 | 180.00 | 214 | 420.00 |
| 105 | 155.00 | 120 | 200.00 | 301 | 340.00 |
| 106 | 305.00 | 201 | 425.00 | 302 | 605.00 |
| 107 | 305.00 | 202 | 425.00 | 303 | 625.00 |
| 108 | 155.00 | 203 | 610.00 | 304 | 605.00 |
| 109 | 165.00 | 204 | 440.00 | 305 | 340.00 |
| 110 | 330.00 | 205 | 440.00 | 501 | 200.00 |
| 111 | 330.00 | 206 | 420.00 | 502 | 200.00 |
| 112 | 165.00 | 207 | 420.00 | 503 | 200.00 |
| 113 | 165.00 | 208 | 425.00 | 504 | 200.00 |
| 114 | 330.00 | 209 | 425.00 | ||
| 115 | 330.00 | 210 | 610.00 |
Stage
Stage Dimensions & Infrastructure
Details regarding the main stage build, barricades, and backstage infrastructure.
Stage Setup
- Dimensions: Total width, depth, and height of the performance area. The stage wings will be at the same height as the main stage (1.80m).
- Barricade: Will be provided locally and positioned 2m from downstage edge as per the attached plan.
- Access: Stairs, ramps, and tech bunkers positioning.
Video Broadcast
For this show, 2 side screens for live broadcast and 1 central screen (12x6m) will be installed.
The signal for the central screen can be received at FOH or on stage via HDMI.
Additionally, the live broadcast production will feature a 3-camera setup:
- 1 camera at FOH.
- 2 cameras in the pit in front of the stage.
Central Screen Equipment (12x6m)
LED Screens
- 2x NOVASTAR M3 MCTRL660 Video Controller
- 144x GLOSHINE ZS6.94 B1 LED Module 6.94 mm Outdoor (12x6m Screen)
Control & Media Server
- 1x BARCO FOLSOM IMAGE PRO II JR
- 1x APPLE MacBook Pro Z0V8 -16Gb / 4 core i7
- 1x RESOLUME ARENA 7 License
Power & Signal Infrastructure
- 1x LIGHTWARE DVI-OPT Tx/Rx 110 DVI Extender via Optical Fiber
- 1x Optical Fiber OM3 MM 100 meters
- 1x Power Box 63 A - 3 SCPX / 3 Shucko / 2 x 32 Amp Trif
- 1x Cabling & Accessories
Staffing (Screen)
- 1x AV Video Crew Chief
- 3x AV LED Screen Technicians
Broadcast Production Equipment
Audiovisual & Cameras
- 1x P2 HD 3-Camera Production Control
- 1x HD Video Mixer
- 3x PANASONIC AG-HPX500E HD Camcorder
- 3x Standard Camera Optics
- 3x Multicore Cable Cart (Signal + Power)
- 3x SWIT S-1071H+ Viewfinder
- 3x PANASONIC RCU AJ-RC10G CCU for HPX500
- 3x CANON FM-12 SD Focus Block
- 3x CAMGEAR V20 EFP GF Camera Tripod
- 1x ALTAIR EF-200 Station
- 3x BLACK MAGIC Mini Converter Optical Fiber 12G Tx/Rx HDSDI Extender
- 2x BLACKMAGIC SmartScope Duo 4K Dual 8" Monitor
- 3x ALTAIR 4W2-200 Intercom Beltpack
- 1x SAMSUNG S24D300H 24" LED Monitor
- 1x DELTA GES302R200035 UPS (SAI)
- 4x ALTAIR AM-100 Intercom Headsets
- 1x PANASONIC AW-HE40 HD-SDI PTZ Camera
- 1x PANASONIC AW-RP50E PTZ Remote Controller
- 1x CANON J33ax11B4 IAS SX12 Telephoto Lens
Early Entry
There will be a special action for the artist's closest fans consisting of an Early Access. This will give them the opportunity to enter the venue 15 minutes before General Admission (GA).
This group will be organized into a dedicated lane to give them priority entry and will be coordinated by the ticketing and security departments.
LIMP BIZKIT — Movistar Arena Schedule / Timeline
- Local production manager: Wero Edge wero@vansandroll.com
- Venue: Movistar Arena
Day 1: Wednesday (1/7/2026)
| Time | Action / Information |
|---|---|
| 06:30 - 07:00 | Load-in (Cuchara de Palo, S.L.) |
| 07:01 - 07:15 | Rigging - Markdown (Tars Rigging) |
| 07:10 - 09:00 | Motors & Steel Rigging (Tars Rigging) |
| 08:00 - 12:00 | Audio Set up (Clair Global Spain, S.L.) |
| 08:01 - 13:00 | Lighting setup (Fluge Audiovisuales S.L.) |
| 08:03 - 08:00 | Get in (Limp Bizkit.) |
| 08:05 - 13:00 | Backline & Risers set up (Call and Play Madrid) |
| 08:06 - 13:00 | FOH Set up (Fluge Audiovisuales S.L.) |
| 08:00 - 11:00 | Breakfast (Cuchara de Palo, S.L.) |
| 12:00 - 12:00 | Party A arrives (Limp Bizkit.) |
| 12:01 - 14:00 | Audio adjustements (Fluge Audiovisuales S.L.) |
| 12:30 - 12:30 | Get in (P.O.D.) |
| 12:00 - 15:30 | Lunch (Cuchara de Palo, S.L.) |
| 13:30 - 16:00 | Backline set up Backstge (P.O.D.) |
| 14:00 - 16:00 | Soundcheck (Limp Bizkit.) |
| 14:15 - 14:30 | Get in (DeathbyRomy) |
| 15:00 - 17:00 | Backstage setup backstage (DeathbyRomy) |
| 16:15 - 17:00 | Soundcheck (P.O.D.) |
| 17:15 - 17:45 | Soundcheck (DeathbyRomy) |
| 17:45 - 18:00 | Doors Early Entry (Movistar Arena) |
| 18:00 - 19:00 | Doors GA (Movistar Arena) |
| 17:00 - 20:30 | Dinner (Cuchara de Palo, S.L.) |
| 19:01 - 19:30 | Showtime (DeathbyRomy) |
| 19:45 - 20:45 | Showtime (P.O.D.) |
| 21:15 - 23:00 | Showtime (Limp Bizkit.) |
| 23:00 - 23:00 | Sound curfew (Movistar Arena) |
| 00:30 - 01:00 | OUT Motors & Steel Rigging (Tars Rigging) |
Contacts
| Name | Role | |
|---|---|---|
| Wero | Prod Manager | wero@vansandroll.com |
| Alex Nooirax | Stage Manager | info@nooirax.com |
| Alberto Lluberas | Security Manager | Alberto.Lluberas@themusicrepublic.es |
| Xavi Payan | Hospitality | produccion@xavipayan.com |
LIMP BIZKIT
- Event: Limp Bizkit @ Movistar Arena
- Date: 01/07/2026
CONTACT DETAILS
| Nombre / Campo | Información |
|---|---|
| Contact Name | Royal Jensen |
| Contact Email | rj@fdm.la |
| Contact Phone | - |
| Management | ( / ) |
TIME PLANNING
| Date | Start | End | Stage | Description |
|---|---|---|---|---|
| 01/07/2026 | 08:00 | 12:00 | Movistar Arena | Get in |
| 01/07/2026 | 12:00 | - | Movistar Arena | Tour arrives |
| 01/07/2026 | 14:00 | 16:00 | Movistar Arena | Soundcheck |
| 01/07/2026 | 21:15 | 23:00 | Movistar Arena | Showtime |
Parking & Access
A parking space has been reserved on Fuente del Berro street, right in front of Door 51. This door will be used as the artist entrance and will be active starting at 6:30 AM.
The tour must provide the license plates of the vehicles bringing the artist's equipment in advance to ensure access.
Maps & References

Hospitality & Dressing Rooms
Contact: Xavi Payan - produccion@xavipayan.com
Summary of catering, dressing room allocations, and rider adjustments based on recent communications.
Dressing Rooms & Facilities
- Location: Level -1 (Stage is at Level -2).
- Artist Dressing Rooms: 5 rooms (A, B, C, D, E). Fully furnished with fridge, couches, coffee tables, TV, showers, and mirrors. Exclusive use.
- Support Acts: 4 locker rooms available for P.O.D. and Death By Romy.
- Production Offices: P3 & P4 are allocated for Artist Production (Level -2, next to the stage).
Catering Schedule & Menu Notes
- Breakfast: For 15 pax until 11:00 AM. Includes bread selection, cold cuts, cheese, bacon and eggs, pastries, fruit, and coffee/tea.
- Lunch: 12:00 PM – 3:30 PM.
- Dinner: 5:00 PM – 8:30 PM. *(Note: Awaiting grilled meat details. Hake fish to be replaced with another meat option).*
Personnel & Rider Adjustments
- Runner: Required starting at 8:00 AM.
- Towels: 10 black bath towels required.
- Wardrobe: Iron & Ironing board are strictly necessary.
- Beverages:
- Powerade instead of Gatorade.
- Corona instead of Modelo.
- Full-fat milk accepted (no half-and-half).
- Tonic water or soda water required.
Documents & Maps
Ground Transportation & Logistics
Overview of the transportation needs for the Band and Crew.
Pick-ups & Transfers
| Date | Movement | Pax / Group | Vehicle | Flight / Notes |
|---|---|---|---|---|
| 28/06/2026 | Airport to Hotel | Artist | 3x Luxury Vans | IB 954 (Arr. 18:45 MAD) |
| 28/06/2026 | Airport to Hotel | Crew | 2x Sprinter Vans (8-seat) | Arr. 16:16 MAD |
| 01/07/2026 | Hotel to Venue | Crew | 2x Sprinter Vans | At disposal from 07:30 AM |
| 01/07/2026 | Hotel to Venue | Artist | 3x Luxury Vans | At disposal from 11:00 AM |
| 01/07/2026 | Venue to Hotel | Artist & Crew | Same vehicles | After show |
| 02/07/2026 | Hotel to Airport | Artist | 3x Luxury Vans | Flight TBD |
| 02/07/2026 | Hotel to Airport | Crew | 2x Sprinter Vans | Flight TBD |
Notes:
- Hotel: Hyatt Regency
- Vendor: Artist Crew - Rafa - contacto.artistcrew@gmail.com
- Driver contacts will be sent via email once final times are clear.
Accommodation
HOTEL: Hyatt Regency Hesperia Madrid
ADDRESS: Paseo de la Castellana, 57
CITY: Madrid STATE: Madrid ZIP: 28046
PHONE: +34 912 10 88 00 GUEST FAX NUMBER: +34 91-210-8899
TO DIAL ROOM TO ROOM: TBD (Check with front desk)
TO DIAL A LOCAL CALL: 9 + Number (Check with front desk)
TO DIAL LONG DISTANCE: 9 + 00 + Country Code + Number (Check with front desk)
INTERNET LOGIN/PASSWORD: Complimentary Wi-Fi / Login usually with Last name and room number
ROOM SERVICE HOURS: 24 hours a day
HOTEL RESTAURANT HOURS: Breakfast: 07:00 to 10:30 (weekdays), 07:30 to 11:00 (weekends)
HEALTH CLUB ON PROPERTY: Yes, Sky Gym (Rooftop), 24/7
FACILITIES & EQUIPMENT OFFERED: Modern workout equipment, free weights, panoramic views
POOL (INDOOR/OUTDOOR/HEATED)(PLEASE SPECIFY): No pool
CLOSEST HEALTH CLUB: On property DISTANCE: 0 km
CLOSEST GOLF COURSE: Centro Nacional de Golf DISTANCE: ~8 km
CLOSEST SHOPPING MALL: Centro Comercial ABC Serrano DISTANCE: ~1.5 km
CLOSEST MOVIE THEATER: Ocine Urban Caleido DISTANCE: ~3 km
CLOSEST COIN OPERATED LAUNDRY: TBD DISTANCE: TBD
TAXI COMPANY: Free Now / Tele Taxi PHONE: +34 913 71 21 31
LOCAL ATTRACTIONS: Museo del Prado, Santiago Bernabéu Stadium, Retiro Park, Royal Palace
Rooming List
Suites (5):
1. Danhert, Jason **
2. Lindvik, Louden/Alie Jo **
3. Owens, Jack**
4. Bartlett, Reid/Adams, Rhonda **
5. Daabs, Leonard**
Standard Rooms (14):
1. Jensen, Royal **
2. Micheals, Cory
3. Tomovich, Bryan
4. Green, Aidan
5. Kimball, Ronald
6. Standen, Joe
7. Brennan, Martin
8. Karon, Gabe
9. Thoreen, Jeff
10. Carino, Francisco
11. Sokolak, Elizabeth
12. Perez, Daniel
13. Noviello, Matteo
14. Amarouche, Youcef